One site · Independent evidence · Clear next steps
Site Viability Scorecard for data center sites
Screening-grade diligence for grid, water, and community readiness. One site, independent evidence, clear next steps.
Start with an address or map point. We check the location and available evidence, then screen community conditions, nearby power, climate, water and permit rules. Use the report to focus deeper work with your utility, engineers, lawyer and local team.
Site Viability Scorecard: $495 for one site. Scope and delivery are confirmed before purchase.
What the scorecard helps you review
Review five practical topics for a single U.S. location. These are review topics, not five new scores or a replacement for the published scoring methodology.
- Grid & power: Utility and grid proximity, public power records and available interconnection context. Proximity is not confirmed capacity, a connection offer or a utility service commitment.
- Water: Water data, documented stress conditions and cooling-related needs, alongside climate context such as heat, drought and air quality. Check source dates and coverage gaps.
- Community: Documented community context and public activity. Community Fit does not establish local support or predict approval. Neighborhood incentive identification is proposed, not a current scorecard inclusion.
- Permitting & regulatory: Permitting records and policy conditions that need closer review. Screening is not legal advice, a permit decision or an engineering study.
- Site and parcel context: Location-specific analysis with a Site Viability score, sources and evidence limits. An approximate map point is not an exact parcel boundary; the composite is not a community-readiness score alone.
What you get for one site
A site scorecard and a PDF report with sources. Review the site result, the scale of the evidence and the limits that affect the findings.
Use the report to organize follow-up questions and keep a record of the screen. Supplemental emergency services, noise, sensitive-site and workforce context may appear where evidence is available. These signals do not change the composite Site Viability score or compliance certificate.
An approximate map point does not establish parcel boundaries. Exact-parcel reports require a validated location. Data coverage and report detail vary by site and source.
Who it is for
Built for VPs of Development, Heads of Site Acquisition and infrastructure private-equity teams evaluating candidate data center sites before committing land deposits or capital. Compare shortlist evidence site by site; one scorecard covers one location.
Landowners and brokers can use a one-site screen before option or exclusivity discussions get ahead of the facts.
Site-selection and community engagement teams can use it to organize local questions after a candidate reaches the shortlist.
Insurance teams have separate package options and review needs. Choose the scope for your audience rather than treating a screen as insurance coverage or a formal disclosure opinion.
From site location to next questions
Locate: submit the site address or map point and project context. Check how exact the location is and which evidence covers it.
Review: read the scorecard, sources and unknowns. Screening calculations take minutes; report delivery and extra work are agreed separately.
Follow up: ask the utility, local officials and specialists to confirm facts that matter to the project. Use their findings for the next decision.
Scorecard or engagement playbook?
The scorecard helps you understand the site and its evidence gaps. The Community Engagement Playbook is a separate product for engagement planning, sequencing and response work.
The Site Readiness Package pairs both products for the same site. Analyst help, prep work and delivery timing must match the written scope. A scorecard alone does not include the full playbook.
Independent screening, not a project guarantee
We do not broker land, earn a transaction commission or take a stake in whether your site closes.
The screen can guide a decision to pause or seek more evidence. It does not predict approval, confirm utility capacity, establish service readiness or replace professional diligence.
Our patented neighborhood-level Planning Areas are planned, not live, and are not part of current scores. Current evidence retains its actual county, block-group or site scale.
Compare site-screening platforms by scope
Sources reviewed October 15, 2026. Not established means the reviewed sources do not settle that feature; it does not mean the vendor lacks it. Subscription prices are not equivalent to a one-site scorecard. Confirm current coverage, terms and prices with each vendor.
| Feature | AI Data Center Impact | PVcase | Acres |
|---|---|---|---|
| Published focus | Independent screening of data center sites before land control or capital deployment. | Advertises data center siting as well as solar site selection, design and yield tools. | Land research, owner lookup, parcel data, valuation and prospecting; capabilities vary by plan. |
| Community readiness evidence | Community Fit and documented public activity, with sources and limits; not proof of support. | A directly equivalent community-readiness score is not established by the sources reviewed. Confirm scope with PVcase. | A directly equivalent community-readiness score is not established by the sources reviewed. Confirm scope with Acres. |
| Water & grid screening | Sourced water conditions, grid proximity and public power context. No utility-capacity or water-service commitment. | Data center siting is advertised. Confirm specific grid, water, data coverage and delivery requirements with PVcase. | Published plans include parcel, flood, elevation and soil information. Confirm grid and water-screening scope with Acres. |
| Published entry pricing | $495 per site. One site; scope and delivery confirmed before purchase. | Custom packages; request a quote. No complete public price list. | Plus: $9.99/month for owner lookup and recreation. Pro: $124.99/month for land valuation and prospecting. Both are monthly-billing prices; annual pricing differs. Enterprise: custom. |
Frequently asked questions
What does the Site Viability Scorecard screen?
It organizes available climate and water, nearby grid, Community Fit and permit context for one named U.S. site, with sources, dates, geographic scale and limits. It is an initial evidence screen, not engineering feasibility, legal advice or confirmation that a project can proceed.
Is Site Viability scoring the same as ESG certification?
No. The scorecard screens ESG-related local conditions within the agreed scope, including climate, water, grid and Community Fit. It does not certify sustainability performance, provide a GRESB score, verify carbon accounting or establish reporting-standard compliance. Use a dedicated assessment process when that is the required output.
Does the scorecard confirm power capacity, water supply or local support?
No. Nearby grid assets are not a utility commitment, regional water stress is not a water-service agreement or right, and Community Fit is not proof of support or an approval prediction. Confirm material questions with the responsible utilities, authorities and qualified professionals.
What happens when site evidence is missing or approximate?
Missing evidence remains an unresolved question, not a favorable finding. Preserve the source date, geographic scale and location precision with each result. An approximate coordinate does not establish parcel boundaries, and regional or county context does not become parcel-specific evidence.
Are supplemental signals and a full engagement playbook included in the score?
Emergency-response, sensitive-receptor and noise, and workforce context are supplemental where available; they do not change the composite viability score or compliance certificate. The full Community Engagement Playbook is a separate product. Confirm report coverage, site precision, any analyst help and delivery before purchase.
Sources and review date
Reviewed 2026-10-15. Vendor claims are attributed to the linked sources.
- PVcase — published product scope and pricing FAQ
Reviewed October 15, 2026. Advertises data center siting alongside solar workflows; the pricing FAQ describes customized packages rather than a complete public price list. This is vendor-published scope, not an independent product test.
- Acres — published plans and pricing
Reviewed October 15, 2026. Plus monthly billing is $9.99/month for owner lookup and recreation; Pro monthly billing is $124.99/month for land valuation and prospecting. Annual billing has different rates. Enterprise is custom. These subscriptions are not equivalent to a one-site data center scorecard.
Choose your next step
Start with an inquiry. We confirm scope, user limits, prep work, analyst help and delivery in writing before purchase. This button does not start a subscription, trial or checkout.